HomeInsightsMontana Requires a Radon…

Montana Requires a Radon Disclosure at Closing. Your Contractor Is Booked Six Weeks Out.

Montana doesn't require a radon test to sell a house — but it does require disclosing one that already exists. If fall's inspection turns one up, the contractor who could fix it may already be booked past your closing date.

By Alex RiveraPublished September 12, 2026

Montana law doesn't require a home seller to test for radon, but it does require disclosing any test the home has already had, plus proof of any mitigation (Montana Radon Control Act, MCA 75-3-606). The catch shows up after that: real Montana mitigation contractors report being booked six to eight weeks out, while a typical inspection contingency runs seven to ten days (Murphy Radon, 2026). A missed call during that window doesn't just cost a job — it can cost the closing.

What Montana's radon law actually requires

The Montana Radon Control Act (MCA 75-3-606) requires every seller of residential property to include a standard radon warning statement on a document signed at or before an offer — the boilerplate language about radon being a naturally occurring gas that can pose health risks at high concentrations. It does not require testing. But if the seller already knows the results of a prior test, the law requires handing the buyer a copy of those results and any evidence of mitigation before or at the time the buyer signs. A seller who complies is shielded from liability over radon; simply handing over test results doesn't itself create a contingency or a right to back out unless the purchase contract spells that out separately.

In practice, that pushes most of the actual decision-making onto the inspection period rather than the disclosure form. A buyer's inspector orders a short-term radon test, the result comes back during a contract contingency window that's commonly negotiated at seven to ten days, and if the number comes back high, the buyer and seller are suddenly negotiating a fix on a clock neither of them set.

The real bottleneck isn't the test. It's getting on the schedule.

A radon mitigation system itself is not a slow job. Bozeman Radon and Mold puts a typical residential install at three to six hours in a single visit, and Pure Air Solutions, in Missoula, says most systems go in within a day (Bozeman Radon and Mold, 2026; Pure Air Solutions, 2026). The delay isn't the work — it's getting a licensed crew to show up at all. Murphy Radon, which serves Missoula, Ravalli, and Mineral counties, says on its own site that it's "consistently booked 6-8 weeks in advance" (Murphy Radon, 2026). Bozeman Radon and Mold is direct about why that matters for a home sale: "elevated radon levels discovered during inspection are one of the most common reasons deals stall," which is exactly why the company says it prioritizes real estate jobs to fit inside a buyer's contingency window (Bozeman Radon and Mold, 2026).

StepHow long it actually takesHow long the deal gives you
Short-term radon test2-5 days of monitoringPart of a 7-10 day contingency
Lab result turnaroundA few days by mail-in kitSame 7-10 day window
Mitigation system install3-6 hours, one visitNot the bottleneck
Getting a crew scheduledCommonly 6-8 weeks outRoutinely blows the contingency

Line those up and the mismatch is obvious: everything about the actual fix takes hours. Everything about getting a contractor to show up takes weeks. A seller who calls three radon companies and reaches voicemail at two of them isn't losing a little time — they're losing the only window the buyer's contract gives them.

Why fall raises the stakes

Montana's own regulator doesn't sugarcoat how common a high reading is here. The state's Department of Environmental Quality says roughly half of the homes tested for radon in Montana come back at or above the EPA's 4.0 pCi/L action level, and DEQ Air Quality Bureau Chief Bo Wilkins has noted that "weather, ground disturbances and changes to your home have the potential to impact radon levels" (DEQ Radon Action Month, 2026). DEQ's own testing guidance tells homeowners running a short-term test for a real estate deal to close up the house and run it "as if it were the winter heating season," regardless of the actual season outside (Montana DEQ, 2026) — because that's when radon tends to concentrate indoors. Fall testing in Montana is, by the state's own instructions, already being run under simulated winter conditions.

Layer that onto a housing market where plenty of buyers are trying to close and move before snow settles in, and a fall listing has less slack than a spring one, not more. A seller who assumed radon was a box to check on a disclosure form finds out otherwise the moment the inspection report lands.

What this looks like for a Flathead Valley company

Big Mountain Insulators, based in Whitefish, has been serving Flathead County on radon work since 1986 — Whitefish, Columbia Falls, and the surrounding valley (Big Mountain Insulators, 2026). A company with that kind of tenure has already outlasted plenty of Montana winters and plenty of closings that came down to the wire. What it can't outrun is a phone that only gets answered during business hours in an industry where the calls that matter most — "my inspection just came back high, my contingency closes in nine days" — don't wait for 8 a.m.

  • A caller with a live contingency deadline needs to be captured and prioritized the moment they call — not queued behind routine testing inquiries.
  • An after-hours or lunch-hour missed call from a title company or realtor coordinating a closing is a different kind of urgent than a routine testing request.
  • A radon company operating near its 6-8 week capacity has the least room in the industry to let a call go to voicemail and hope for a callback.
Skyline Automations builds AI phone answering for Montana trades where a missed call isn't just a lost job — it's a blown deadline. An AI receptionist logs every call, flags time-sensitive ones like a closing contingency, and never sends a realtor to voicemail. Book a free AI audit to see what it would catch on your line.

Sources

  1. Montana DEQ (2026)
  2. DEQ Radon Action Month (2026)
  3. Murphy Radon (2026)
  4. Bozeman Radon and Mold (2026)
  5. Pure Air Solutions
  6. Big Mountain Insulators (2026)
[ 05 ]Questions

Related questions

Clear answers to the questions operators ask most. Still not sure if AI fits your business? Talk to us — no pitch, just a straight read on where it pays off.

Does Montana require radon testing before selling a house?

No. Montana law (MCA 75-3-606, the Montana Radon Control Act) requires sellers to provide a standard radon warning disclosure and, if a test was already done, to share those results and any mitigation records. It does not require ordering a new test as a condition of sale.

How long does radon mitigation take to install in Montana?

The physical install is fast — Bozeman Radon and Mold puts most residential jobs at three to six hours in a single visit, and Pure Air Solutions says most systems go in within a day. The real delay is scheduling: Murphy Radon, serving the Missoula area, says it's commonly booked six to eight weeks out.

What happens if a home inspection finds high radon during a Montana closing?

Montana law doesn't automatically give the buyer a right to cancel or renegotiate over a radon result — that depends entirely on what the purchase contract says. Most contracts set a short inspection contingency window, commonly seven to ten days, which is where radon test results and any negotiation actually get resolved.

Why do radon levels change with the seasons in Montana?

Montana's DEQ recommends running real estate radon tests with the home closed up as if it were winter heating season, since that's when radon tends to concentrate indoors. DEQ's own guidance names weather and structural changes to a home as factors that affect a given reading.

Related questions

Related services

More from Insights

No Pitch, No Obligation

See exactly where AI pays off in your business

Book a free AI audit. We'll map your biggest leak — missed calls, slow follow-up, manual admin — and show you the system that fixes it. No pitch, no obligation.

Free · no obligation~30 minutesYou own everything